GXT-VBL
Site Survey Workspace
Structured multi-step field form for IT/OT infrastructure validation
Step 1 of 4
0% completeUse Left/Right Arrow keys to move between steps
Survey stage
01 / 04
Site & Contacts
Lines in scope
6
Auto-syncs from Step 1 input
Readiness
Planning
Live status of survey progress
Site & contacts
Factory / site information
Complete on arrival — confirm all details with customer IT/OT contact
Location not captured yet.
RoleFull nameDepartmentPhone / mobileEmail
NameRole / designationPhoneEmailOn-site dates
Each line will have 1 × Syrotech SY-8000P-4S-IND switch in a 6U wall-mount rack. If >6 lines, the fiber ring design will need adjustment — flag in Risks tab.
Comms room
Communications room / server room survey
This room will house the 42U floor rack with Aruba 6100, 6 edge PCs, and KVM. Verify physical readiness.
Air conditioning present?
Space for 42U rack (W×D cm)?
Adequate lighting?
Fire suppression system?
Photo itemTaken?File name / refNotes
Overall room — 4 corners
Available floor space for 42U rack
Power outlet locations in room
Existing cable trays / ducts entering room
Cable entry wall penetrations
Existing switches / servers / equipment
Air conditioning unit
Any obstructions or hazards
Line survey
Production line survey
One block per line. Do NOT change existing device IPs without OEM written approval.
All CAT6 runs MUST be under 80 m. Measure each run with laser/wheel measure. Add 10% contingency. Use Add line for each production line; if scope grows beyond 6 lines, flag in Risks tab.
Start with one line and add more only when the site needs them.
Sign-off
Survey sign-off & notes
Confirm survey completion with customer and GX team lead
Ready to submit
Review all sections before submitting. Once submitted, this survey will be sent to the GX engineering team for design review.